coloma school exterior

New School Building at Coloma Convent School, Croydon

Address: Shirley, Croydon

Client: Governing Body Coloma Convent Girls School

Project Value: £1,300,000

Project Started:   05.01.2004

Contract Period: 40 weeks

We were contracted to construct a new build, two storey Technology Block, which connects to the existing building via a single storey link. The building stands on a split level site, so there is a partial lower ground floor, which is block clad. The ground and first floors are timber clad.

Additional works were required to the existing block and ‘Shirley Court’, a Grade 2 listed building, to allow access from the old buildings to the new.

The new block has provided design and technology teaching spaces, preparation space, pupil’s toilets and access toilets.

Summary of Works:

  • Underground services
  • Drainage works
  • External walls and cladding
  • Partitions
  • Plastering and Screeding
  • Mechanical and Electrical Installation
  • Carpentry Works
  • Floor and Ceiling Finishes
  • Painting and Decorating
  • Sanitary ware fitting
  • Lift
  • Staircase